Project Noon 机动游艇
- 长度
- 52 m171 ft
- 交付
- 2029
- 船厂
- Tureddi Yachts
- 宾客
- 12,分布于6间客舱
- 巡航
- 15 kn
- 建造地
- 土耳其
- 要价
- 约 US$30,800,000
关于Project Noon
英文原文描述
A full-displacement hull under a 52-metre profile is what shapes Project Noon's performance: 19 knots flat out, 15 knots at cruise, in a construction of steel and aluminium that the yard is building for delivery in 2029. The numbers describe a yacht built to cover distance steadily rather than to sprint between anchorages.
Build and provenance
Tureddi Yachts is building Project Noon in Turkey, in steel and aluminium. Leonardo Cecchi designed her, both inside and out, at the Florence-based practice Yellow Addition Design Studio. She is a full-displacement design at 499 gross tonnes on a 52-metre length, the hull form that gives a yacht her range and sea-keeping rather than her outright speed.
Layout and accommodation
Twelve guests sleep across six cabins: four double guest cabins sit below on the lower level, and two master suites occupy the main deck above, each opening to its own private terrace. Those two main-deck suites of Project Noon can be joined into a single, larger owner's apartment. A crew of six runs her, with the saloon and dining set aft on the main deck and a separate media room on the upper deck for a more informal night in.
Performance and engineering
The engineering option that stands out is hybrid propulsion, adding hydrogen fuel cell technology to the conventional plant for a buyer who wants lower-emission running. As built, she cruises at 15 knots and reaches 19 knots flat out, speeds that suit a full-displacement hull rather than push against it. A beam of 9.2 metres and a draft of 2.5 metres carry the volume that hull form needs below the waterline.
Where she lies and how to see her
Project Noon lies, for now, in build at the Tureddi yard in Turkey. We arrange a visit there and join a buyer for it, and after an offer is accepted, her survey and sea trial wait until she is afloat and can be put through them properly.
完整规格说明
- 长度
- 171' / 52 m
- 宽度
- 9.2 m
- 吃水
- 2.5 m
- 总吨位
- 499 GT
- 宾客
- 12
- 客舱
- 6
- 船员
- 6
- 巡航速度
- 15 kn
- 最高速度
- 19 kn
- 交付
- 2029
- 船体
- 单体船
- 风格
- 排水量
- 国家
- 土耳其
建造
- 外观设计师
- Leonardo Cecchi - Yellow Addition Design Studio
- 室内设计师
- Leonardo Cecchi - Yellow Addition Design Studio
市场定位
按每米计算,其要价低于该区间的中位数。
| 所属集团 | 在售数量 | 要价 | 每米 |
|---|---|---|---|
| 这艘游艇 | 3,081万美元 | US$592,000 | |
| 50至70米游艇 | 77 | 5,014万美元 | US$871,000 |
| 建于2026至2032 | 251 | 2,128万美元 | US$560,000 |
每个分类均列出了Boatcrowd平台上在售的游艇(包括该艘游艇在内),每个分类中的数值均为中位数。以其他货币标注的价格均按当日汇率换算。
购买费用
- 验船
- 通常情况下,在报价被接受且交易尚未成为无条件交易之前,买家会委托进行船况检验和试航。费用取决于游艇的尺寸及其起吊地点,且由买家指定检验员。
- 注册与船旗
- 该游艇将注册在买家选择的船旗国,该船旗国将收取相应的费用,并有其自身的检验和船员要求。若游艇通过公司持有,则可能转让的是股份而非船舶本身,这将导致应付款项发生变化。
- 增值税与进口
- 是否需要缴纳增值税以及在何处缴纳,取决于游艇的当前状态、悬挂船旗、买家的居住地以及交船地点。如果卖方已声明其增值税状态,该信息将与要价一同显示在游艇页面上,并在提出报价前以书面形式予以确认。
- 运营成本
- 自您拥有游艇之日起,船员、泊位、保险、船级认证及年度维护等服务将持续提供。若该游艇同时用于租赁,相关费用可抵扣运营成本;在您决定购买前,我们将详细列明该游艇在过去一个航季的实际收益情况。
该尺寸游艇的预计运行成本详见尺寸页面:50至70米游艇的运营成本。
关于Project Noon的问题
Project Noon何时交付?
该游艇目前正在Tureddi Yachts的土耳其船厂建造中,预计交付时间为2029年。在“在建船只”列表中,所标注的年份指交付年份,绝非建造年份;所显示的规格参数为船厂已承诺的配置。
Project Noon的要价可以协商吗?
EUR 27,500,000是她的要价。报价将提交给船东:当您准备好时,我们会代您提出报价并协商条款。
Project Noon的运营成本是多少?
自您拥有游艇之日起,船员、泊位、保险、船级认证及年度维护服务将持续提供。该尺寸游艇的预计运行成本详见尺寸页面:50至70米游艇的运营成本。
所提供信息均基于善意,不构成合同条款。所列船只可能因已售、价格变动或撤销而无法出售,恕不另行通知。
游艇上架提醒
有类似游艇上架时请通知我
同一船厂、相同尺寸和类型。一旦有此类船只上架,我们将通过电子邮件通知您,每天最多一次。
您的搜索: 船厂:Tureddi Yachts · 机动游艇 · 50至70米
请查收您的收件箱:我们已发送一封确认邮件,请点击链接确认此提醒。








