コンテンツへスキップ
Boatcrowd
弊社販売チームまでお問い合わせください

所要時間は約1分です

ご契約の義務はございません · 24時間以内にご返信いたします

← Liviaに戻る
Boatcrowd
販売中のヨット · モーターヨット

Livia

52 m · 171' · RMK Marine · 建造中、2028年引き渡し

Livia, 2028 RMK Marine、写真 1
Livia, 2028 RMK Marine、写真 2 Livia, 2028 RMK Marine、写真 3 Livia, 2028 RMK Marine、写真 4 Livia, 2028 RMK Marine、写真 5 Livia, 2028 RMK Marine、写真 6
キャビン
7
ゲスト
12就寝
乗組員
11
希望価格
EUR 27,500,000
停泊地
トルコ

内覧はBoatcrowdを通じて手配されます。

詳細仕様

全長
171' / 52 m
全幅
9.1 m
総トン数
499 GT
ゲスト
12
キャビン
7
乗組員
11
引き渡し
2028
船体
モノハル
スタイル
排水量
国
トルコ

建造

船体材質
スチール
エクステリアデザイナー
Red Yacht Design
船級
Bureau Veritas (BV)

Liviaについて

A Dutch naval architecture practice and a design studio have shaped this fifty-two metre hull together, and the result reads as considered rather than assembled. RMK Marine is building Livia for delivery in 2028, sized at 499 gross tons on a 52-metre length with a 9.1-metre beam, kept under the tonnage line that keeps a yacht's operating rules simpler. Twelve guests are carried across seven cabins, with eleven crew to run her.

Build and provenance

RMK Marine, one of Turkey's established yards, is building Livia to a hull shaped by a Dutch naval architecture practice, with Red Yacht Design responsible for the exterior. She is a steel-hulled monohull, classed with Bureau Veritas, and 2028 is her scheduled delivery year rather than a year she has already been surveyed: a buyer here is an early participant in the build, not an inspector of a finished yacht.

Layout and accommodation

Twelve guests are accommodated across seven cabins, with a crew of eleven to run the yacht: a ratio generous enough to keep service unhurried through a full guest programme. The owner's suite sits on the main deck, set apart from the guest cabins below.

Performance and engineering

Livia's propulsion runs on a four-unit IPS arrangement rather than conventional shaftlines, chosen for a tighter engine room, quieter running and finer manoeuvrability at low speed, with added redundancy from having four units rather than two. As a 2028 delivery, her cruising and top speed figures are not yet fixed.

Where she lies and how to see her

Livia is under construction at the yard in Turkey, with her 2028 delivery still ahead. Boatcrowd arranges viewings of her build and attends them alongside a prospective buyer. Survey and sea trial follow once an offer is accepted and she is complete, in that order and not before.

記載内容は善意に基づいて提供されていますが、契約上の拘束力はありません。掲載内容は、予告なく先行販売、価格変更、または掲載取り下げとなる場合があります。

すべてのヨットは検証および検査済みです 世界中で販売中の1,214隻のヨット 造船所199社を一か所で比較