跳至主要内容
Boatcrowd
联系我们的销售团队

大约需要一分钟

无需承担任何义务 · 我们将在24小时内回复

Boatcrowd
待售游艇 · 机动游艇

Nuvolari Lenard 52 Plus

53 m · 173' · Mengi Yay · NL52 Plus · 在建,2028年交付

Nuvolari Lenard 52 Plus, 2028 Mengi Yay NL52 Plus,照片1
Nuvolari Lenard 52 Plus, 2028 Mengi Yay NL52 Plus,照片2 Nuvolari Lenard 52 Plus, 2028 Mengi Yay NL52 Plus,照片3 Nuvolari Lenard 52 Plus, 2028 Mengi Yay NL52 Plus,照片4 Nuvolari Lenard 52 Plus, 2028 Mengi Yay NL52 Plus,照片5 Nuvolari Lenard 52 Plus, 2028 Mengi Yay NL52 Plus,照片6
宾客
10人入住
船员
9
巡航速度
12kn
最高速度
16.5kn
要价
EUR 36,300,000

按今日汇率计算,价格为约US$40,700,000

停泊位置
土耳其

看船事宜通过Boatcrowd安排。

完整规格说明

长度
173' / 53 m
宽度
9 m
总吨位
499 GT
宾客
10
船员
9
巡航速度
12 kn
最高速度
16.5 kn
交付
2028
船体
单体船
风格
排水量
国家
土耳其

关于Nuvolari Lenard 52 Plus

At 53 metres, the Nuvolari Lenard 52 Plus carries 499 gross tons, a hull drawn to keep her tonnage low for her length. Mengi Yay is building her now in Turkey, with delivery due in 2028, and a buyer stepping in during construction can still shape her interior before she is finished.

Build and provenance

Mengi Yay is the builder, working to a design from Nuvolari Lenard, the studio behind both her exterior and interior styling on this, the yard's NL52 Plus. Van Oossanen Naval Architects engineered her hull to keep her tonnage down. At 53 metres (173 feet) length and 9 metres beam, she is a big-volume monohull built to a displacement style rather than a planing one, which favours a smooth ride over outright speed. Her delivery is scheduled for 2028, so a buyer is effectively commissioning a near-finished vessel rather than starting from a blank hull.

Layout and accommodation

Because the Nuvolari Lenard 52 Plus is still under construction, her cabin arrangement is not yet fixed: the yard has left scope to personalise interior finishes and layout rather than deliver a set plan. That leaves a buyer genuine input on how the accommodation is configured before any of it is committed to construction.

Performance and engineering

She cruises at 12 knots and reaches 16.5 knots at full speed, figures that describe a displacement hull built for steady, efficient running rather than a planing yacht chasing top speed. On a yacht built to keep her tonnage down, efficiency is the aim over a long passage rather than outright speed.

Where she lies and how to see her

She is under construction in Turkey, with delivery due in 2028. Boatcrowd arranges visits to the build for qualified buyers and attends them, and once an offer on her is accepted, the usual survey and sea trial follow ahead of delivery.

所提供信息均基于善意,不构成合同条款。所列船只可能因已售、价格变动或撤销而无法出售,恕不另行通知。

每艘游艇均经过核实和检查 全球共有1,214艘游艇待售 199家船厂,一站式比较